CDR has visited the site and carried out a desk study providing:
- Technical design and engineering supporting documents for the replacement of rock by CC blocks;
- Support in communication with the BBA, Management Support Consultant and/or River Training Works Designer in order to obtain design approval.
Site Visit Padma Bridge