CDR has visited the site and carried out a desk study providing:

  • Technical design and engineering supporting documents for the replacement of rock by CC blocks;
  • Support in communication with the BBA, Management Support Consultant and/or River Training Works Designer in order to obtain design approval.

Site Visit Padma Bridge