CDR has carried out the following assignments:

  • Undertook a site visit with droning and inspection of the Breakwater and Armour units;
  • Studied all available construction and maintenance & repair reports (2010 onwards);
  • Performed wave modelling assessments and analysis;
  • Analysed quality of construction material;
  • Submitted a comprehensive report including conclusions and recommendations;

Site Visit Benin and Bathymetry