CDR is carrying this assignment out in the following phases:

  1. Review of the revetment design, performance of the installed revetment and the performance of the executed repairs;
  2. Indicate errors and/or flaws in: a.) the revetment design, b.) the construction method, c.) the revetment execution, d.) the repair works;
  3. Propose modifications and/or repairs to the slope revetment as are considered necessary to ensure the design life of the structure;
  4. Make comments as to considered liabilities and legal support.