The following activities have been performed: a.o.

  • Detailed downtime assessment
  • Wave penetration modelling (PHAROS),
  • Armour stability assessment
  • Overtopping calculations
  • Design of typical cross-sections

The result of the engineering assessment was a concise report with recommendations for viable optimisations for design and constructability.