Proposed terminal locations A, B, C and D. (Google Maps)
CDR, in conjunctions with DevConsult, has carried out the desk study encompassing the following parts:
- High-level assessment of the most appropriate location of the floating harbour;
- Preliminary assessment of the access channel (e.g. sedimentation and suitability) and impact on the environment;
- Anchoring of the floating harbour;
- Assessment of the bed in terms of composition, morphology and anchoring options.