• Français
  • BREAKWATERHEALTHSCAN®
CDR International
  • Home
  • About us
  • Team
  • Disciplines
    • Coastal Protection and ICZM
    • MetOcean & Hydrodynamic Numerical Modelling
    • Breakwaters, Revetments and Marine Structures
    • Port Master Planning
    • Land Reclamation
    • Flood Protection and IWRM
    • Urban Drainage
    • Inland Waterway Transport
    • Geosynthetics Engineering
  • Projects
  • News
  • Contact

Dubai UAE – Overseas AST – Bluewaters Island Design Breakwater

  • 1

Offshore the Dubai Marina, the Bluewaters Island development is currently under construction which further enhances the Dubai waterfront. Overseas AST is installing a district cooling pipeline from the mainland to the island over the existing main breakwater of the Dubai Marina entrance. The approximate pipeline location has a length of approx. 300m.
CDR provided Technical/Engineering assistance for:
– Technical solution for the installation and protection of the pipeline (two alternatives);
– Principle design drawings of the recommended technical solution;
– Redesign of the breakwater whereby the pipeline is located inside the breakwater.

CDR International B.V.

Head office & registration:
Koningin Wilhelminalaan 43
3818HN Amersfoort
Netherlands
Phone: +31 8 5301 0885

© 2021 CDR International BV

Designed by In Beeld Webdesign and Twente PC

  • Home
  • About us
  • Team
  • Disciplines
    • Coastal Protection and ICZM
    • MetOcean & Hydrodynamic Numerical Modelling
    • Breakwaters, Revetments and Marine Structures
    • Port Master Planning
    • Land Reclamation
    • Flood Protection and IWRM
    • Urban Drainage
    • Inland Waterway Transport
    • Geosynthetics Engineering
  • Projects
  • News
  • Contact