• Français
  • BREAKWATERHEALTHSCAN®
CDR International
  • Home
  • About us
  • Team
  • Disciplines
    • Coastal Protection and ICZM
    • MetOcean & Hydrodynamic Numerical Modelling
    • Breakwaters, Revetments and Marine Structures
    • Port Master Planning
    • Land Reclamation
    • Flood Protection and IWRM
    • Urban Drainage
    • Inland Waterway Transport
    • Geosynthetics Engineering
  • Projects
  • News
  • Contact

Ghana – CHEC – Tema Port Development

  • 1

CHEC has requested CDR to provide assistance and engineering services to optimize the FEED design during the tender phase for TEMA Port, Ghana. Optimization of the design included: Layout design, Optimizing performance of the Port and Breakwater design. For the layout design optimization, the correct functioning of the Port should be confirmed by wave disturbance analysis and navigational analysis.
CDR has delivered: Report, CAD Drawings, BOQ estimate, Wave disturbance Study (numerical model), and Navigational study report.

CDR International B.V.

Head office & registration:
Koningin Wilhelminalaan 43
3818HN Amersfoort
Netherlands
Phone: +31 8 5301 0885

© 2021 CDR International BV

Designed by In Beeld Webdesign and Twente PC

  • Home
  • About us
  • Team
  • Disciplines
    • Coastal Protection and ICZM
    • MetOcean & Hydrodynamic Numerical Modelling
    • Breakwaters, Revetments and Marine Structures
    • Port Master Planning
    • Land Reclamation
    • Flood Protection and IWRM
    • Urban Drainage
    • Inland Waterway Transport
    • Geosynthetics Engineering
  • Projects
  • News
  • Contact