CDR has carried out task 5 of the Feasibility Study, which included:

  • Analysis past and present situation Odaw river and Korle lagoon i.r.t. interceptor weir
  • Function and design of interceptor weir
  • Assessment present situation interceptor weir
  • Hydraulic assessment, sedimentation assessment
  • Future options interceptor weir
  • Waste removal and business case for re-use of plastic
  • Conclusions and recommendations for interceptor weir
  • Recommendations for performance-based dredging criteria

Site Visit Accra