
The following activities have been performed: a.o.
- Detailed downtime assessment
- Wave penetration modelling (PHAROS),
- Armour stability assessment
- Overtopping calculations
- Design of typical cross-sections
The result of the engineering assessment was a concise report with recommendations for viable optimisations for design and constructability.