CDR has carried out the requested morphological calculations with the following risk assessment:
- Analyse the sediment transport and local erosion / accretion
- Analyse the amount of sand loss i) outside of the project area and ii) outside of design levels
- Determine the safe distance between the Reclamation and Breakwater footprint such that earlier placed rock material will not be covered by sand material
- What is the safe level for sand dumping in the NW area to avoid erosion