CDR has carried out the requested morphological calculations with the following risk assessment:

  1. Analyse the sediment transport and local erosion / accretion
  2. Analyse the amount of sand loss i) outside of the project area and ii) outside of design levels
  3. Determine the safe distance between the Reclamation and Breakwater footprint such that earlier placed rock material will not be covered by sand material
  4. What is the safe level for sand dumping in the NW area to avoid erosion