The tasks of CDR’s Hydrologist / Civil Engineer were as follows:

  • Assess inflow from mainland;
  • Indicate location and design of Eastern Closure Elephant Pass Lagoon;
  • Indicate dimension Mullian Link Canal;
  • Collect relevant hydrological information connected to the project.

The analysis of the hydrology and civil works relevant for the “River for Jaffna” were carried out and a comprehensive report was composed.

Site Visit Jaffna